Mixed Isotope Decontamination Using CBI DeconGel 1101 and 1121 on Multiple Surfaces at ALARON Nuclear Services

Download

Michael Otlowski1, Scott Eckler1, Bruce Olczak1, Garry Edgington2, Roberto Mandanas2

1Alaron Corporation
2138 State Rt 18
Wampum, PA 16157
Phone: (724)535-5777
Fax: (724)535-1165
webmaster@alaron-nuclear.com
www.alaron-nuclear.com

2Cellular Bioengineering, Inc.
1946 Young St.
Honolulu, HI 96826
Phone: (808)949-2208
Fax: (808)949-2209
rmandanas@cellularbioengineering.com
www.cellularbioengineering.com

Field Test Date: July 21st-24th

Introduction

Alaron Nuclear Services and Cellular Bioengineering (CBI) conducted a field study to evaluate the use and efficacy CBI’s Decon Gel, both the brush applied and the spray applied versions employed.  The purposes of this field study were to:

  • Decontaminate multiple types of equipment, tools, storage containers and a fuel cask in a commercial setting.
  • Determine decontamination efficacy of Decon Gel DOE relevant end uses.
  • Assess overall operational costs for decontamination using decon gel.

Alaron is engaged in nuclear services related to power generation and those that service the industry.  One of its services is the decontamination and refurbishment of equipment, tools, storage containers and fuel casks at its NRC-licensed facility in Wampum, PA. 

Summary Results

Multiple surfaces and items were decontaminated utilizing Decon Gel with impressive results.  With the exception of the Zircaloy-4 Fuel Pellet Tubes, 90-100% reduction in loose activity was achieved in all other tests. 
Highlights include:

  • 90% reduction of loose beta contamination on the side an NAC NLI storage cask.
  • 98% reduction of loose beta contamination on the soiled cap of an NAC NLI storage cask.
  • 99% reduction of loose beta contamination on the bare concrete floor of the heavily used RJM containment area.

Overall operational costs, reduction in man-dose exposure and implementation into Alaron’s work plan are currently under evaluation.

NAC NLI Cask

Nuclear Assurance Corporation NLI casks, used to transport spent fuel, were decontaminated with DeconGel 1101 and 1121.  The principle isotopes on the exterior of the cask were Cs-137, Cs-134, Co-60, Mn-54, Ag-110m and Zn-65.   The cask exterior was constructed from 316 stainless steel. 

Decon Gel 1101 was applied to the left portion of the cask (Locations 1-6) with a common paint brush.  The middle and right hand portions of the cask (Locations 7-17) were sprayed with Decon Gel 1121 with a GRACO UltraMax 795 airless sprayer equipped with a 0.021” tip at 3300 psi.  Both products were allowed to dry for 18-24 hours.

Direct readings with a Geiger meter were not performed due to the background radiation from the contaminated cask interior. 

Removal of the dried film yielded an average decrease in the activity of loose contamination of 90%.

  Loose beta Loose beta Loose beta
Location activity (dpm/100cm^2) activity (dpm/100cm^2) % Activity Removal
  PRE-DECON POST-DECON TOTAL DECON
       
1 2,808 55 98
2 1,013 78 92
3 995 75 92
4 745 285 62
5 985 113 89
6 578 40 93
7 385 133 66
8 675 23 97
9 1,945 50 97
10 2,723 35 99
11 1,003 45 96
12 825 80 90
13 728 95 87
14 1,225 73 94
15 1,063 60 94
16 1,100 70 94
17 2,998 35 99
18 1,698 65 96
19 468 208 56
20 1,140 105 91
21 1,360 23 98
22 1,138 95 92
23 585 73 88
24 1,183 28 98
25 678 65 90
26 1,068 95 91
27 2,070 88 96
Average 1,229 81 90

NAC NLI Cask End Cap

The end of the NAC NLI cask was sprayed with Decon Gel 1121.  This differed from the decontamination of the side of the cask in that the end had a visible layer of dark oily dirt, whereas the sides initially had a clean appearance.  Removal of the dried film yielded an average decrease in activity of loose contamination of 98% and removed the oily dirt layer resulting in a clean appearance.

  Loose beta Loose beta Loose beta
Location activity (dpm/100cm^2) activity (dpm/100cm^2) % Activity Removal
  PRE-DECON POST-DECON TOTAL DECON
       
1 30,000 800 97
2 30,000 700 98
3 30,000 700 98
Average 30,000 733 98

NAC Cask Trunion Leg

An aluminum NAC cask trunion leg, used as a part of the lifting yoke to place and remove a cask from the fuel pool, was decontaminated with DeconGel 1101 applied with a common paint brush.  The principle isotopes on the support were Cs-137, Cs-134, Co-60, Mn-54, Ag-110m and Zn-65.

Removal of the dried film yielded an average decrease of fixed contamination of 54% and loose contamination of 100%.  The gel was reapplied and removal of the dried film yielded an average total decrease of fixed contamination of 80%.

  First application Second application
  Fixed beta Fixed beta Fixed beta Fixed beta Fixed beta Fixed beta
Location activity (cpm/probe) activity (cpm/probe) % Activity Removal activity (cpm/probe) % Activity Removal % Activity Removal
  PRE-DECON POST- 1st DECON POST- 1st DECON POST- 2nd DECON POST- 2nd DECON TOTAL DECON
             
1A 12,000 4,000 67 2,000 50 83
2A 15,000 8,000 47 4,000 50 73
3A 40,000 10,000 75 4,000 60 90
1B 14,000 8,000 43 4,000 50 71
2B 22,000 14,000 36 5,000 64 77
3B 22,000 10,000 55 3,000 70 86
Average 20,833 9,000 54 3,667 57 80
    First application Second application
  Loose beta Loose beta Loose beta Loose beta Loose beta Loose beta
Location activity (dpm/
100cm^2)
activity (dpm/
100cm^2)
% Activity Removal activity (dpm/
100cm^2)
% Activity Removal % Activity Removal
  PRE-DECON POST- 1st DECON POST- 1st DECON POST- 2nd DECON POST- 2nd DECON TOTAL DECON
             
1A 280,000 800 100 600 25 100
2A 140,000 900 99 700 22 100
3A 250,000 700 100 600 14 100
1B 160,000 700 100 600 14 100
2B 160,000 900 99 800 11 100
3B 120,000 700 99 600 14 100
Average 185,000 783 100 650 17 100

RJM Containment Area

The RJM containment area at ALARON Nuclear Services, used to process (cut, grind, etc.) highly contaminated materials, was decontaminated with DeconGel 1101 (Locations 1-3, 7-12) and 1121 (Locations 4-6).  The principle isotopes on the unsealed concrete slab were Cs-137, Cs-134, Co-60, Mn-54, Fe-55, Ni-63, Ni-59, Zn-65, Zr-95, U-238, U-234.  

Decon Gel 1101, applied with a stand up trowel, peeled from the bare concrete floor very easily.  Decon Gel 1121 was able to be peeled, but was more difficult due to insufficient film thickness.  Removal of the dried film yielded an average decrease of fixed alpha contamination of 87%, fixed beta contamination of 61%, loose alpha contamination of 94% and loose beta of 99%.

  Fixed beta Fixed beta Fixed beta Fixed alpha Fixed alpha Fixed alpha
Location activity (cpm/probe) activity (cpm/probe) % Activity Removal activity (cpm/probe) activity (cpm/probe) % Activity Removal
  PRE-
DECON
POST-
DECON
POST-DECON PRE-DECON POST-DECON TOTAL DECON
             
1 3,000 1,000 66.7 100 6 94.0
2 11,000 4,000 63.6 80 6 92.5
3 17,000 1,000 94.1 80 6 92.5
4 7,000 1,000 85.7 240 20 91.7
5 4,000 1,000 75.0 240 50 79.2
6 11,000 6,000 45.5 240 6 97.5
7 24,000 14,000 41.7 300 50 83.3
8 54,000 29,000 46.3 360 80 77.8
9 5,000 2,000 60.0 500 80 84.0
10 3,000 2,000 33.3 150 10 93.3
11 6,000 3,000 50.0 150 50 66.7
12 3,000 1,000 66.7 400 30 92.5
Average 12,333 5,417 60.7 237 33 87.1

Readings were background corrected.

  Loose beta Loose beta Loose beta Loose alpha Loose alpha Loose alpha
Location activity (dpm/
100cm^2)
activity (dpm/
100cm^2)
% Activity Removal activity (dpm/
100cm^2)
activity (dpm/
100cm^2)
% Activity Removal
  PRE-DECON POST-DECON POST-DECON PRE-DECON POST-DECON TOTAL DECON
             
1 130,000 800 99.4 500 60 88.0
2 100,000 600 99.4 200 50 75.0
3 120,000 600 99.5 500 60 88.0
4 80,000 700 99.1 800 20 97.5
5 60,000 500 99.2 800 20 97.5
6 120,000 600 99.5 1000 30 97.0
7 70,000 800 98.9 1500 40 97.3
8 80,000 800 99.0 1600 20 98.8
9 80,000 900 98.9 2200 30 98.6
10 50,000 900 98.2 1200 30 97.5
11 50,000 500 99.0 600 40 93.3
12 60,000 600 99.0 1800 30 98.3
Average 83,333 692 99.1 1,058 36 93.9

Braidwood Fuel Rack Chevron

A 316 stainless steel Braidwood fuel rack chevron, used to store spent fuel inside of the fuel pool, was decontaminated with DeconGel 1101 applied with a common paint brush.  The principle isotopes on the support were Cs-137, Cs-134, Co-60, Mn-54, Fe-55, Ni-63, Ni-59, Zn-65, Zr-95.

Removal of the dried film yielded an average decrease of fixed contamination of 36% and loose contamination of 76%.  The gel was reapplied and removal of the dried film yielded an average decrease of fixed contamination of 59% and loose contamination of 92%.

  First application Second application
  Loose beta Loose beta Loose beta Loose beta Loose beta Loose beta
Location activity (dpm/
100cm^2)
activity (dpm/
100cm^2)
% Activity Removal activity (dpm/
100cm^2)
% Activity Removal % Activity Removal
  PRE-DECON POST- 1st DECON POST- 1st DECON POST- 2nd DECON POST- 2nd DECON TOTAL DECON
             
1 160,000 3,000 98 1,000 67 99
2 140,000 18,000 87 800 96 99
3 50,000 3,000 94 1,000 67 98
4 70,000 20,000 71 900 96 99
5 100,000 3,000 97 1,000 67 99
6 40,000 15,000 63 900 94 98
7 8,000 2,000 75 700 65 91
8 10,000 2,000 80 800 60 92
9 6,000 2,000 67 900 55 85
10 5,000 1,500 70 700 53 86
11 3,000 1,500 50 700 53 77
12 4,000 1,500 63 700 53 83
Average 49,667 6,042 76 842 69 92
             
             
  First application Second application
  Fixed beta Fixed beta Fixed beta Fixed beta Fixed beta Fixed beta
Location activity (cpm/probe) activity (cpm/probe) % Activity Removal activity (cpm/probe) % Activity Removal % Activity Removal
  PRE-DECON POST- 1st DECON POST- 1st DECON POST- 2nd DECON POST- 2nd DECON TOTAL DECON
             
1 15,000 3,000 80 1,500 50 90
2 8,000 3,000 63 1,500 50 81
3 4,000 3,000 25 2,500 17 38
4 10,000 6,000 40 2,500 58 75
5 5,000 3,000 40 1,500 50 70
6 4,000 2,000 50 1,300 35 68
7 5,000 5,000 0 4,000 20 20
8 6,000 5,000 17 3,500 30 42
9 6,000 5,000 17 3,000 40 50
10 2,500 1,500 40 600 60 76
11 3,000 2,000 33 1,600 20 47
12 3,000 2,000 33 1,500 25 50
Average 5,958 3,375 36 2,083 38 59

Pilgrim Condensate Pump Impeller Shim

A series 304 stainless steel Pilgrim condensate pump impeller shim, from a condensate pump which heats and supplies water to the steam generator or reactor, was decontaminated with DeconGel 1101 applied with a common paint brush.  The principle isotopes on the shim were Cs-137, Cs-134, Co-60, Mn-54, Fe-55, Ni-63, Ni-59, Sr-90, Co-58.  Removal of the dried film yielded an average decrease of fixed contamination of 79% and loose contamination of 96%.  The gel was reapplied and removal of the dried film yielded an average decrease of fixed contamination of 87% and loose contamination of 100%. 

  First application Second application
  Fixed beta Fixed beta Fixed beta Fixed beta Fixed beta Fixed beta
Location activity (cpm/probe) activity (cpm/probe) % Activity Removal activity (cpm/probe) % Activity Removal % Activity Removal
  PRE-DECON POST- 1st DECON POST- 1st DECON POST- 2nd DECON POST- 2nd DECON TOTAL DECON
             
1 10,000 1,800 82 800 56 92
2 24,000 1,000 96 600 40 98
3 10,000 3,800 62 3,000 21 70
4 12,000 3,000 75 1,500 50 88
Average 14,000 2,400 79 1,475 42 87
  First application Second application
  Loose beta Loose beta Loose beta Loose beta Loose beta Loose beta
Location activity (dpm/
100cm^2)
activity (dpm/
100cm^2)
% Activity Removal activity (dpm/
100cm^2)
% Activity Removal % Activity Removal
  PRE-DECON POST- 1st DECON POST- 1st DECON POST- 2nd DECON POST- 2nd DECON TOTAL DECON
             
1 200,000 8,000 96 700 91 100
2 200,000 6,000 97 800 87 100
3 200,000 8,000 96 800 90 100
4 200,000 8,000 96 900 89 100
Average 200,000 7,500 96 800 89 100

Zircaloy-4 Fuel Pellet Tubes

Zirconium Alloy (Zircaloy-4), used for placement of fuel pellets, was decontaminated with DeconGel 1101 applied with a common paint brush or dipping.  The tubes were already split open as the first step in the currently employed sand blasting method.  The principle isotopes on the tubes were U-235, U-234, U-238. 

Removal of the dried film yielded an average decrease of fixed contamination of 71% and loose contamination of 72%.

  Fixed Alpha Fixed Alpha Fixed Alpha Loose Alpha Loose Alpha Loose Alpha
Location activity (dpm/
100cm^2)
activity (dpm/
100cm^2)
% Activity Removal activity (dpm/
100cm^2)
activity (dpm/
100cm^2)
% Activity Removal
  PRE-DECON POST-DECON TOTAL DECON PRE-DECON POST-DECON TOTAL DECON
             
1 500 200 60 300 80 73
2 600 250 58 200 60 70
3 600 100 83 200 60 70
4 800 150 81 200 50 75
Average 625 175 71 225 63 72

Control Rod Drive Transport Container

A control rod drive transport container, used for transportation of CRDM’s, was decontaminated with DeconGel 1121 that was spray applied with a GRACO Ultra Max 795 airless sprayer.  The container surfaces were painted carbon steel. The principle isotopes on the box were Cs-137, Cs-134, Co-60, Mn-54, Fe-55, Ni-63, Ni-59, Sr-90, Co-58. 

Removal of the dried film yielded an average decrease of fixed contamination of 96% and loose contamination of 90%.

  Fixed beta Fixed beta Fixed beta Loose beta Loose beta Loose beta
Location activity (dpm/
100cm^2)
activity (dpm/
100cm^2)
% Activity Removal activity (dpm/
100cm^2)
activity (dpm/
100cm^2)
% Activity Removal
  PRE-DECON POST-DECON TOTAL DECON PRE-DECON POST-DECON TOTAL DECON
             
1 5000 80 98 10000 800 92
2 5000 70 99 3000 700 77
3 7000 100 99 5000 800 84
4 10000 100 99 8000 800 90
5 800 90 89 5000 600 88
6 5000 800 84 40000 800 98
7 6000 90 99 35000 800 98
8 5000 80 98 25000 700 97
Average 5475 176 96 16375 750 90

Pilgrim Condensate Pump Collar

A series 304 stainless steel Pilgrim condensate pump collar, from a condensate pump which heats and supplies water to the steam generator or reactor, was decontaminated with DeconGel 1101 applied with a common paint brush.  The principle isotopes on the shim were Cs-137, Cs-134, Co-60, Mn-54, Fe-55, Ni-63, Ni-59, Sr-90, Co-58. 

Removal of the dried film yielded an average decrease of fixed contamination of 85.2% and loose contamination of 99.6%.  The gel was reapplied and removal of the dried film yielded an average decrease of fixed contamination of 92.4% and loose contamination of 99.5%.

  First application Second application
  Fixed beta Fixed beta Fixed beta Fixed beta Fixed beta Fixed beta
Location activity (cpm/probe) activity (cpm/probe) % Activity Removal activity (cpm/probe) % Activity Removal % Activity Removal
  PRE-DECON POST- 1st DECON POST- 1st DECON POST- 2nd DECON POST- 2nd DECON TOTAL DECON
             
1 16,000 3,500 78.1 2,000 42.9 87.5
2 40,000 4,000 90.0 1,000 75.0 97.5
3 8,000 1,500 81.3 1,000 33.3 87.5
4 12,000 1,500 87.5 800 46.7 93.3
5 12,000 2,000 83.3 800 60.0 93.3
6 20,000 1,800 91.0 1,000 44.4 95.0
             
Average 18,000 2,383 85.2 1,100 50.4 92.4
  First application Second application
  Loose beta Loose beta Loose beta Loose beta Loose beta Loose beta
Location activity (dpm/100cm^2) activity (dpm/100cm^2) % Activity Removal activity (dpm/
100cm^2)
% Activity Removal % Activity Removal
  PRE-DECON POST- 1st DECON POST- 1st DECON POST- 2nd DECON POST- 2nd DECON TOTAL DECON
             
1 200,000 700 99.7 700 0.0 99.7
2 200,000 800 99.6 800 0.0 99.6
3 200,000 1,000 99.5 1,000 0.0 99.5
4 200,000 1,000 99.5 900 10.0 99.6
5 200,000 1,000 99.5 1,000 0.0 99.5
6 200,000 900 99.6 900 0.0 99.6
             
Average 200,000 900 99.6 883 1.7 99.6